Skip to content

MTE Consultants Acquires RIZZ Engineering, Strengthening Expertise in Structural Design and Precast Concrete

BWXT Cambridge Expansion
Industrial & Manufacturing

BWXT Cambridge Expansion

BWXT is undertaking a significant expansion of its manufacturing facility in Cambridge, Ontario.

Project overview

BWXT is undertaking a significant expansion of its manufacturing facility in Cambridge, Ontario. The $80 million investment will expand the facility by 55,000 square feet, positioning BWXT to target growth opportunities in nuclear energy. Construction began in 2024 and is expected to be completed in 2026.

MTE's Involvement

MTE is proud to be serving as the prime consultant on this project, managing a multidisciplinary team that includes MTE’s civilgeotechnicalstructuralenvironmental, and surveying services, as well as external mechanical, electrical, and architectural consultants. 

Our role as prime consultant includes: 

  • Liaising with BWXT representatives to establish budget, scope, and schedule
  • Supporting the contractor selection process
  • Securing approvals, including site plan and building permits
  • Overseeing coordination of design and construction activities across all disciplines

BWXT has operated on this site for over 160 years.  The limited property size added complexity when determining optimal locations for the additions, particularly with respect to parking, truck turning movements, setbacks and landscaping. 

The expansion features 60-foot clear ceiling heights and new production capabilities, presenting distinctive structural design challenges. The new building extensions compensate for the skewed orientation of the existing buildings, and the new production systems are designed to seamlessly transition with  existing configurations. 

In addition, coordinating code compliance for exiting and other safety requirements required close collaboration among multiple disciplines and with city officials. 

By expanding BWXT’s production capabilities, the new expansion is anticipated to create new opportunities, both for BWXT and for the Cambridge community. 

This project reflects both the innovation and complexity of modern industrial design — and MTE is proud to support BWXT in delivering a facility designed to meet increased global interest and investment in nuclear energy.