MTE's Involvement
As the civil consultant on the project, MTE was responsible for detailed site grading, servicing, and stormwater management design in support of Site Plan Approval, Building Permit applications, and construction-phase inspection services.
Our civil team contributed to the design of a 43,000 sq. ft. addition that includes an indoor aquatic centre with a 25-metre, six-lane pool, a therapeutic pool, supporting facilities, a club-format, equipment-based fitness centre, and shared common areas. The renovation also encompassed 65,000 sq. ft. of existing space, repurposing and relocating multi-purpose program rooms and upgrading architectural finishes throughout the original building.