MTE's Involvement
Our team delivered structural engineering support for the construction of a new two-story structure adjacent to the existing powerhouse. This work demanded close coordination with architectural and mechanical teams to ensure seamless integration of systems. We conducted advanced load analyses, designed reinforced support systems, and adhered to healthcare facility standards throughout the process. The project was executed with a focus on minimizing disruption to hospital operations while delivering a structurally sound and future-ready expansion.