MTE's Involvement
In collaboration with Cornerstone Architecture, our structural engineering team has designed a two-story, 72,000-ft2 school. This design incorporates precast panels supported by load-bearing concrete masonry blocks and steel beams, bolstered by steel columns.
Throughout the construction process, our team has overseen contract administration and conducted periodic site inspections. These efforts ensure that the construction aligns with approved engineering drawings. As the project nears completion, the new school is on track to commence classes in January 2024.